Within the scope of constructing a chemical precipitation unit at wastewater treatment plant Goch (Niersverband), most of the technical equipment has been installed. This comprises the steel mezzanine, the control cabinet including the dosing unit and the PE-HD tanks. Over the next few weeks, the switch and control gear will be added.