News

Ingenieurbüro Siedlungswasserwirtschaft

Operations Management Ulrichstein

Due to a defective bearing of the rotational biological contactor (RBC) of wastewater treatment…

Weiterlesen

Reconstruction of a rainwater retention basin

In early 2016, IWR GmbH was tasked by Eigenbetrieb Stadtentwässerung Böblingen (SEBB) with the…

Weiterlesen

Photovoltaic systems on wastewater treatment plants

On each of the three wastewater treatment plants of the city of Ulrichstein (Bobenhausen II,…

Weiterlesen

Well at Hümmericher Mühle

The well at Hümmericher Mühle is now finished. IWR GmbH has handled the entire construction…

Weiterlesen

Coarse filtering device at stormwater overflow tank

In 2016, IWR GmbH was tasked with the planning and construction supervision of the coarse filtering…

Weiterlesen

Full-time support

Our team is growing! We are happy to report that Dipl.-Ing. Dipl. Wirt.-Ing. Andreas Goergen has…

Weiterlesen

DWA seminar ‘BBE-Schein’

We participated in the new DWA seminar 'BBE-Schein'. The seminar 'Bauwerksbeschichtung in…

Weiterlesen

Vakuumstation für Unterdruckentwässerung / Vakuumentwässerung

Vacuum station assembly – Lohmühlenstraße

In December 2017, both of the vacuum tanks for the planned vacuum station cologne Lohmühlenstraße…

Weiterlesen

DWA Water Management seminar

During DWA's Water Management seminar 'Entwässerungskonzepte und Sanierungsplanung' from 28…

Weiterlesen

Marvin Elsbecker

Marvin Elsbecker joins full-time

Welcome aboard Marvin! After successfully completing his 8-week practicum phase at IWR GmbH as an…

Weiterlesen

Logo Stadtentwässerung Böblingen

Water protection reports for SEBB

Since 2015, we have been writing the annual water protection reports for Stadtentwässerung…

Weiterlesen

Logo Stadtentwässerung Böblingen

Flugfeldklinikum Böblingen-Sindelfingen

Flugfeldklinikum Böblingen-Sindelfingen is being built between Böblingen and Sindelfingen. For the…

Weiterlesen

A manhole is measured

Development of Ulrichstein Langewiese

In October 2017, we invited tenders for the development of the area Ulrichstein Langewiese.…

Weiterlesen

Logo DWA

DWA workshop Pipe Ramming

Mr. Kleine-Tebbe attended the DWA workshop "Pipe ramming - improved economic efficiency through new…

Weiterlesen

Optimisation of sewage sludge disposal Habichtswald

We were asked by the municipality of Habichtswald to develop a concept for the optimisation of…

Weiterlesen