New drainage concept: planning and construction supervision by IWR

A new drainage concept was planned for the Emscherbruch forestry base as part of the Emscher renaturation project. RVR Ruhr Grün commissioned our engineering office with the planning and construction supervision of measures as part of a drainage concept adapted to the new guidelines.

Emscherbruch forestry base

Small wastewater treatment plant for 20 PE

A new drainage concept with pre-treatment of the wastewater was created to adapt to the current guidelines. This required the planning of a separation system (rainwater and wastewater sewers) as well as the planning and construction of a small wastewater treatment plant for 20 population equivalents (PE ), which was commissioned on 13.11.2023. In order to avoid overloading the small sewage treatment plant, it was also necessary to disconnect the existing oil separator on the property from the drainage system of the forestry base. The subject of the measure was:

-Laying empty conduits and inspection chambers as well as rainwater and wastewater pipes
-A small sewage treatment plant and the construction of a staircase with railings and gate to facilitate access


Here you will find further information on our drainage planning services.