{"id":6515,"date":"2023-06-01T08:22:22","date_gmt":"2023-06-01T06:22:22","guid":{"rendered":"https:\/\/www.iwr-ing.com\/news\/sewer-rehabilitation-koerperich\/"},"modified":"2025-06-12T12:14:28","modified_gmt":"2025-06-12T10:14:28","slug":"sewer-rehabilitation-koerperich","status":"publish","type":"post","link":"https:\/\/www.iwr-ing.com\/en\/news\/sewer-rehabilitation-koerperich\/","title":{"rendered":"Reduction of extraneous water input"},"content":{"rendered":"<h3><strong>Extraneous water input to be reduced<\/strong><\/h3>\n<p>As subcontractors of our partner office, Dr. Bruch und Partner, we recently jointly planned the first section of the K\u00f6rperich sewer rehabilitation for the S\u00fcdeifelwerke. The goal of the project was to reduce infiltration water in the community&#8217;s drainage system and thus lessen the load on the wastewater treatment plant. A trenchless rehabilitation method using pipe lining was used to achieve this goal. The planning process also included the rehabilitation of damaged manholes.<\/p>\n<h3>Tube lining method for renovation<\/h3>\n<p>Pipe lining is a modern, inexpensive and effective method of rehabilitating sewers. It involves inserting a pipe liner, e.g. made of GRP, into the existing sewer, setting it up and curing it. This creates a pipe within the pipe. With this method, cracks and leaks in the sewer network can be repaired economically.<\/p>\n<p>The rehabilitation of the shafts was tendered to be renewed, for example, with mortar lining or via grouting of the infiltrations with packers, depending on the type of damage.<\/p>\n<h3>What&#8217;s next?<\/h3>\n<p>Currently, we are in the process of implementing the planned measure. The completion of the first construction phase is scheduled for July 31, 2023. Afterwards, the rehabilitation of the remaining sections will be implemented successively.<\/p>\n<p>If you are also interested in a professional renovation of your sewer or sewer system, e.g. to reduce the entry of extraneous water, we will be happy to assist you. Contact us for a consultation and a customized concept for your project.<\/p>\n<hr>\n<p><img decoding=\"async\" class=\"alignnone size-large wp-image-6498\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/\/Kanalsanierung-Koerperich-Aufstellen-Arbeitsgeraet-1024x770.jpg\" alt=\"Sewer rehabilitation K\u00f6rperich Setting up the pipe liner\" width=\"840\" height=\"632\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Aufstellen-Arbeitsgeraet-1024x770.jpg 1024w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Aufstellen-Arbeitsgeraet-300x226.jpg 300w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Aufstellen-Arbeitsgeraet-768x577.jpg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Aufstellen-Arbeitsgeraet-350x263.jpg 350w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Aufstellen-Arbeitsgeraet-uai-258x194.jpg 258w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Aufstellen-Arbeitsgeraet-uai-1032x776.jpg 1032w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Aufstellen-Arbeitsgeraet-uai-720x541.jpg 720w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Aufstellen-Arbeitsgeraet-uai-516x388.jpg 516w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Aufstellen-Arbeitsgeraet.jpg 1390w\" sizes=\"(max-width: 840px) 100vw, 840px\" \/><em>Setting up the working equipment at the starting shaft of a rehabilitation site.<\/em><\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-6496 size-large\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/\/Kanalsanierung-Koerperich-Schlauchliner-770x1024.jpg\" alt=\"A sewer manhole in K\u00f6rperich: external water ingress to be reduced through renovation\" width=\"770\" height=\"1024\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Schlauchliner-770x1024.jpg 770w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Schlauchliner-226x300.jpg 226w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Schlauchliner-768x1022.jpg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Schlauchliner-350x466.jpg 350w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Koerperich-Schlauchliner.jpg 1045w\" sizes=\"(max-width: 770px) 100vw, 770px\" \/><em>Target shaft: the GRP pipe liner is installed and a UV light chain is pulled through it for curing.<\/em><\/p>\n<hr>\n<p>More information about the method of <a href=\"https:\/\/de.wikipedia.org\/wiki\/Schlauchlining\" target=\"_blank\" rel=\"noopener\">pipe lining<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Extraneous water input to be reduced As subcontractors of our partner office, Dr. Bruch und Partner, we recently jointly planned [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":6499,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-6515","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/6515","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/comments?post=6515"}],"version-history":[{"count":6,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/6515\/revisions"}],"predecessor-version":[{"id":14853,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/6515\/revisions\/14853"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media\/6499"}],"wp:attachment":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media?parent=6515"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/categories?post=6515"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/tags?post=6515"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}