{"id":4343,"date":"2022-06-13T13:56:44","date_gmt":"2022-06-13T11:56:44","guid":{"rendered":"https:\/\/www.iwr-ing.com\/news\/drainage-concept-rvr-emscherbruch\/"},"modified":"2023-07-18T11:00:31","modified_gmt":"2023-07-18T09:00:31","slug":"drainage-concept-rvr-emscherbruch","status":"publish","type":"post","link":"https:\/\/www.iwr-ing.com\/en\/news\/drainage-concept-rvr-emscherbruch\/","title":{"rendered":"Drainage concept RVR &#8211; Emscherbruch"},"content":{"rendered":"<h4>Drainage concept required for forestry training centre<\/h4>\n<p>Due to the renaturation of the River Emscher in the area of the previous wastewater discharge point of the RVR forestry training centre Emscherbruch, a new drainage concept for the site of the training centre is required. IWR GmbH was commissioned by Regionalverband Ruhr, Division IV &#8211; Environment and Green Infrastructure, with the approval planning of this drainage concept. Wastewater and rainwater from the site were previously discharged untreated into the Emscher River in a combined system.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-medium wp-image-4335\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/\/IMG_1691-225x300.jpeg\" alt=\"Discharge at the Emscherbruch forestry training centre\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/IMG_1691-225x300.jpeg 225w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/IMG_1691-768x1024.jpeg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/IMG_1691-1152x1536.jpeg 1152w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/IMG_1691-uai-258x344.jpeg 258w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/IMG_1691-uai-1032x1376.jpeg 1032w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/IMG_1691.jpeg 1536w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/>     <img decoding=\"async\" class=\"alignnone size-medium wp-image-4337\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/\/IMG_1692-225x300.jpeg\" alt=\"Drainage concept for Emscherbruch forestry training centre must be redesigned\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/IMG_1692-225x300.jpeg 225w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/IMG_1692-768x1024.jpeg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/IMG_1692-1152x1536.jpeg 1152w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/IMG_1692.jpeg 1536w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/p>\n<h4>Construction of a small wastewater treatment plant according to DWA-A 131 planned<\/h4>\n<p>As part of the planned renaturation of the River Emscher, the drainage at the forestry training centre is to be adapted to current guidelines and redesigned accordingly. The new drainage plan provides for the unbundling of the combined sewage network and the construction of a small wastewater treatment plant for 20 PE according to <a href=\"https:\/\/webshop.dwa.de\/de\/dwa-a-131-belebungsanlagen-6-2016.html\" target=\"_blank\" rel=\"noopener\">DWA-A 131<\/a>, which is to treat the sewage before it is discharged into the Emscher. In addition, the approval of an existing infiltration trench for rainwater is planned in accordance with <a href=\"https:\/\/webshop.dwa.de\/de\/dwa-a-138-versickerungsanlagen-4-2005.html\" target=\"_blank\" rel=\"noopener\">DWA-A 138.<\/a><\/p>\n<hr>\n<p>Overview of our <a href=\"https:\/\/www.iwr-ing.com\/unsere-leistungen\/professionelle-entwaesserungsplanung\/\">services regarding drainage planning<\/a>.<\/p>\n<p>You can find more information about small wastewater treatment plants <a href=\"https:\/\/de.wikipedia.org\/wiki\/Kleinkl%C3%A4ranlage\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p>Do you have any questions? Please <a href=\"https:\/\/www.iwr-ing.com\/en\/contact\/\">contact<\/a> us.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Drainage concept required for forestry training centre Due to the renaturation of the River Emscher in the area of the [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":4334,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-4343","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/4343","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/comments?post=4343"}],"version-history":[{"count":7,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/4343\/revisions"}],"predecessor-version":[{"id":6639,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/4343\/revisions\/6639"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media\/4334"}],"wp:attachment":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media?parent=4343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/categories?post=4343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/tags?post=4343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}