{"id":2862,"date":"2021-05-19T10:07:10","date_gmt":"2021-05-19T08:07:10","guid":{"rendered":"https:\/\/www.iwr-ing.com\/news\/further-education-and-training-in-the-team\/"},"modified":"2023-07-15T16:20:23","modified_gmt":"2023-07-15T14:20:23","slug":"further-education-and-training-in-the-team","status":"publish","type":"post","link":"https:\/\/www.iwr-ing.com\/en\/news\/further-education-and-training-in-the-team\/","title":{"rendered":"Further education and training of the team"},"content":{"rendered":"<p>In order to expand our expertise and keep it up to date, we attach great importance to the continuing education and training of IWR&#8217;s team. Our employees regularly participate in further education events and conferences. The following training courses and conferences have been attended by IWR staff within the last six months:<\/p>\n<ul>\n<li>Anomaly detection based on acoustic data (Fraunhofer IDMT)<\/li>\n<li>Saving energy with drive technology (ABB)<\/li>\n<li>Basics of wastewater treatment plant operation (DWA)<\/li>\n<li>Photovoltaic systems &#8211; planning, installation, maintenance, accidents, availability, contracts (Technische Akademie Esslingen)<\/li>\n<li>New Waste Water Ordinance &#8211; What is required? Softening of requirements for small wastewater treatment plants in Germany (ATB Water)<\/li>\n<li>EN 12566, the European standard for small sewage treatment plants Status quo and prospects (ATB Water)<\/li>\n<li>Demonstration of Building Information Modeling (BIM) in Water Management on the basis of a sewer network (DWA)<\/li>\n<li>BIM application at Emschergenossenschaft and Lippeverband (DWA)<\/li>\n<li>&#8220;Certified Quality Assurance Officer FB according to RAL GZ 507&#8221;.<\/li>\n<li>&#8220;EXPERT 1 to RAL GZ 507 &#8211; appointed external supervisor liquid soil&#8221;.<\/li>\n<li>IKT product tests &#8220;Liquid Soils (ZFSV) in Sewer Construction&#8221;.<\/li>\n<li>iTWO AVA basics training<\/li>\n<li>iTWO Cost monitoring with iTWO<\/li>\n<li>DWA Site Drainage Days<\/li>\n<li>&#8220;RAL GZ 507 &#8211; appointed external supervisor liquid soil&#8221; practical seminar<\/li>\n<li>Drafting of contracts and claim management for planners<\/li>\n<li>Issues in the execution of architect and engineer contracts and how to avoid them<\/li>\n<li>19th Vergabetag Baden-W\u00fcrttemberg<\/li>\n<\/ul>\n<p>Furthermore, in May we will attend the 6th Stormwater Overflow Basin Expert Forum (2021).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In order to expand our expertise and keep it up to date, we attach great importance to the continuing education [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2276,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-2862","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/2862","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/comments?post=2862"}],"version-history":[{"count":4,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/2862\/revisions"}],"predecessor-version":[{"id":6604,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/2862\/revisions\/6604"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media\/2276"}],"wp:attachment":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media?parent=2862"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/categories?post=2862"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/tags?post=2862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}