{"id":2846,"date":"2021-06-10T13:56:04","date_gmt":"2021-06-10T11:56:04","guid":{"rendered":"https:\/\/www.iwr-ing.com\/news\/renewal-of-technical-ventilation-systems\/"},"modified":"2022-06-16T18:04:53","modified_gmt":"2022-06-16T16:04:53","slug":"renewal-of-technical-ventilation-systems","status":"publish","type":"post","link":"https:\/\/www.iwr-ing.com\/en\/news\/renewal-of-technical-ventilation-systems\/","title":{"rendered":"Renewal of technical ventilation systems"},"content":{"rendered":"<p>For the municipal enterprise Stadtentw\u00e4sserung B\u00f6blingen (SEBB), the renewal of technical ventilation systems in a total of eleven structures is to be carried out in order to guarantee sufficient air exchange and thus ensure explosion protection in the respective operating buildings, MID shafts and other rooms.<\/p>\n<p>IWR GmbH has completed the processing of this project from the basic evaluation to the preparation of the award of contract. In the first stage of the tendering process, three of the total of eleven structures will be put out to tender and the implementation of the services will be commissioned.<\/p>\n<p>The first phase of the planned measure is to be completed by the end of November.<\/p>\n<p>&nbsp;<\/p>\n<div id='gallery-1' class='gallery galleryid-2846 gallery-columns-3 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.iwr-ing.com\/en\/news\/renewal-of-technical-ventilation-systems\/dsc_0022-2\/'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/DSC_0022-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.iwr-ing.com\/en\/news\/renewal-of-technical-ventilation-systems\/dsc_002-2\/'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/DSC_002-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>For the municipal enterprise Stadtentw\u00e4sserung B\u00f6blingen (SEBB), the renewal of technical ventilation systems in a total of eleven structures is [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2328,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-2846","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/2846","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/comments?post=2846"}],"version-history":[{"count":2,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/2846\/revisions"}],"predecessor-version":[{"id":3271,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/2846\/revisions\/3271"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media\/2328"}],"wp:attachment":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media?parent=2846"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/categories?post=2846"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/tags?post=2846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}