{"id":15862,"date":"2025-12-30T12:29:01","date_gmt":"2025-12-30T11:29:01","guid":{"rendered":"https:\/\/www.iwr-ing.com\/news\/pv-system-on-screw-lift\/"},"modified":"2026-01-06T14:19:18","modified_gmt":"2026-01-06T13:19:18","slug":"pv-system-on-screw-lift","status":"publish","type":"post","link":"https:\/\/www.iwr-ing.com\/en\/news\/pv-system-on-screw-lift\/","title":{"rendered":"PV system on screw lift"},"content":{"rendered":"<h3><b><span data-contrast=\"auto\">Modern PV system on Sindelfingen screw lift<\/span><\/b><\/h3>\n<p><span data-contrast=\"auto\">Two photovoltaic systems were installed at the B\u00f6blingen-Sindelfingen wastewater treatment plant, one above the screw lift and a second on the directly adjacent roof. <\/span><span data-contrast=\"auto\">a second on the directly <\/span> <span data-contrast=\"auto\">adjacent company building. The client is the Eigenbetrieb Stadtentw\u00e4sserung B\u00f6blingen (SEBB). <\/span><span data-ccp-props=\"{\"134233117\":false,\"134233118\":false,\"201341983\":0,\"335551550\":1,\"335551620\":1,\"335559685\":0,\"335559737\":0,\"335559738\":240,\"335559739\":240,\"335559740\":279}\"> <\/span><\/p>\n<p><span data-ccp-props=\"{\"134233117\":false,\"134233118\":false,\"335559738\":240,\"335559739\":240}\"><img decoding=\"async\" class=\"alignnone wp-image-15857\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk.jpg\" alt=\"A yellow crane mounts the PV modules on the new steel roof construction on the screw lift\" width=\"420\" height=\"315\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk.jpg 1600w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk-300x225.jpg 300w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk-1024x768.jpg 1024w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk-768x576.jpg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk-1536x1152.jpg 1536w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk-350x263.jpg 350w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk-uai-258x194.jpg 258w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk-uai-1440x1080.jpg 1440w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk-uai-1032x774.jpg 1032w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kran-montiert-PV-Module-auf-Schneckenhebewerk-uai-720x540.jpg 720w\" sizes=\"(max-width: 420px) 100vw, 420px\" \/><br \/>\n<em>A crane mounts PV modules on the worm gear hoist<\/em><br \/>\n<\/span><\/p>\n<h3><b><span data-contrast=\"auto\"><br \/>\nTotal output of 30 kWp<\/span><\/b><\/h3>\n<p><span data-contrast=\"auto\">The PV modules<\/span><span data-contrast=\"auto\"> were mounted on a<\/span><span data-contrast=\"auto\">mounted on a removable steel structure. This means that the superstructure of the structure, including the <a href=\"https:\/\/de.wikipedia.org\/wiki\/Photovoltaikanlage\" target=\"_blank\" rel=\"noopener\">PV system<\/a>, can be dismantled by crane for maintenance work if necessary and stored on the side of the site. A total of 30 or 36 modules with 455 Wp each are used, which corresponds to a total installed output of 30.03 kWp. The inverters are rated at 12 kW or 15 kWp.   <\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-15851\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/PV-Anlage-Schneckenhebewerk-Boeblingen-Sindelfingen.jpg\" alt=\"Location of the PV system on the Sindelfingen screw lift marked in red\" width=\"420\" height=\"272\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/PV-Anlage-Schneckenhebewerk-Boeblingen-Sindelfingen.jpg 856w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/PV-Anlage-Schneckenhebewerk-Boeblingen-Sindelfingen-300x194.jpg 300w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/PV-Anlage-Schneckenhebewerk-Boeblingen-Sindelfingen-768x497.jpg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/PV-Anlage-Schneckenhebewerk-Boeblingen-Sindelfingen-350x227.jpg 350w\" sizes=\"(max-width: 420px) 100vw, 420px\" \/><br \/>\n<i>Location of the PV system on the screw lift<\/i><br \/>\n<\/span><span data-ccp-props=\"{\"134233117\":false,\"134233118\":false,\"201341983\":0,\"335551550\":1,\"335551620\":1,\"335559685\":0,\"335559737\":0,\"335559738\":240,\"335559739\":240,\"335559740\":279}\"> <\/span><\/p>\n<p><span data-contrast=\"auto\">The plant is expected to generate around 33,923 kWh of electricity per year. This means that 16% of the lift&#8217;s electricity requirements can be covered directly on site. Battery storage is not planned. Completion took place in December 2025.   <\/span><span data-ccp-props=\"{\"134233117\":false,\"134233118\":false,\"201341983\":0,\"335551550\":1,\"335551620\":1,\"335559685\":0,\"335559737\":0,\"335559738\":240,\"335559739\":240,\"335559740\":279}\"> <\/span><\/p>\n<p><span data-contrast=\"auto\">IWR GmbH was responsible for the planning and construction supervision.<\/span><\/p>\n<p><span data-ccp-props=\"{\"134233117\":false,\"134233118\":false,\"201341983\":0,\"335551550\":1,\"335551620\":1,\"335559685\":0,\"335559737\":0,\"335559738\":240,\"335559739\":240,\"335559740\":279}\">&#8212;<\/span><\/p>\n<p><span data-ccp-props=\"{\"134233117\":false,\"134233118\":false,\"201341983\":0,\"335551550\":1,\"335551620\":1,\"335559685\":0,\"335559737\":0,\"335559738\":240,\"335559739\":240,\"335559740\":279}\">Article about a <a href=\"https:\/\/www.iwr-ing.com\/en\/news\/photovoltaic-system-at-pumping-station-breitenbach\/\" target=\"_blank\" rel=\"noopener\">photovoltaic system at the Breitenbach pumping station<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Modern PV system on Sindelfingen screw lift Two photovoltaic systems were installed at the B\u00f6blingen-Sindelfingen wastewater treatment plant, one above [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":15858,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-15862","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/15862","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/comments?post=15862"}],"version-history":[{"count":3,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/15862\/revisions"}],"predecessor-version":[{"id":15868,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/15862\/revisions\/15868"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media\/15858"}],"wp:attachment":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media?parent=15862"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/categories?post=15862"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/tags?post=15862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}