{"id":14335,"date":"2024-11-28T21:36:37","date_gmt":"2024-11-28T20:36:37","guid":{"rendered":"https:\/\/www.iwr-ing.com\/news\/site-drainage-fire-station\/"},"modified":"2025-05-14T10:36:49","modified_gmt":"2025-05-14T08:36:49","slug":"site-drainage-fire-station","status":"publish","type":"post","link":"https:\/\/www.iwr-ing.com\/en\/news\/site-drainage-fire-station\/","title":{"rendered":"Fire station south &#8211; site drainage"},"content":{"rendered":"<h2><span data-contrast=\"auto\">Feasibility study &#8211; site drainage for new fire station south<\/span><span data-ccp-props=\"{}\"> <\/span><\/h2>\n<h3><span data-contrast=\"auto\">New construction of the southern fire station<\/span><span data-ccp-props=\"{}\"> <\/span><\/h3>\n<p><span data-contrast=\"auto\">In the years 2020 to 2022, the <a href=\"https:\/\/www.bergischgladbach.de\/\" target=\"_blank\" rel=\"noopener\">Bergisch Gladbach City<\/a> Council passed several resolutions approving the construction of the new Fire Station 2\/ South on a plot of land near the A4 highway. As part of the preparation of the new development plan, the drainage of the property to be developed must be ensured. To this end, Abwasserwerk Bergisch Gladbach commissioned IWR GmbH to carry out a feasibility study.<\/span><\/p>\n<h3>Task and scope of the feasibility study<span data-ccp-props=\"{}\"> <\/span><\/h3>\n<p><span data-contrast=\"auto\">A study by the <a href=\"https:\/\/www.supergelb-architekten.de\/\" target=\"_blank\" rel=\"noopener\">architectural firm &#8220;SUPERGELB&#8221; from Cologne<\/a> envisages an area of 8,000 m\u00b2 for the fire and rescue station in various drafts, with one draft serving as the basis for the feasibility study. In addition to ensuring a feasible drainage concept, our work focused on a comparison of variants. A total of six rainwater drainage options were examined and evaluated. In addition, a budget was drawn up and a mathematical proof of flooding was carried out.<\/span><\/p>\n<p><span data-contrast=\"auto\"><img decoding=\"async\" class=\"alignnone wp-image-14331 size-large\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/\/Neubau-Feuerwache-Sued-Bergisch-Gladbach-Entwaesserungsplanung-IWR-GmbH-1024x612.jpg\" alt=\"Fire Station South City of Bergisch Gladbach - Drainage planning by IWR\" width=\"840\" height=\"502\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Neubau-Feuerwache-Sued-Bergisch-Gladbach-Entwaesserungsplanung-IWR-GmbH-1024x612.jpg 1024w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Neubau-Feuerwache-Sued-Bergisch-Gladbach-Entwaesserungsplanung-IWR-GmbH-300x179.jpg 300w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Neubau-Feuerwache-Sued-Bergisch-Gladbach-Entwaesserungsplanung-IWR-GmbH-768x459.jpg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Neubau-Feuerwache-Sued-Bergisch-Gladbach-Entwaesserungsplanung-IWR-GmbH-350x209.jpg 350w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Neubau-Feuerwache-Sued-Bergisch-Gladbach-Entwaesserungsplanung-IWR-GmbH-uai-258x154.jpg 258w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Neubau-Feuerwache-Sued-Bergisch-Gladbach-Entwaesserungsplanung-IWR-GmbH-uai-720x430.jpg 720w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Neubau-Feuerwache-Sued-Bergisch-Gladbach-Entwaesserungsplanung-IWR-GmbH-uai-516x308.jpg 516w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Neubau-Feuerwache-Sued-Bergisch-Gladbach-Entwaesserungsplanung-IWR-GmbH.jpg 1027w\" sizes=\"(max-width: 840px) 100vw, 840px\" \/><br \/>\n<em>Variant of the cubature study for the southern fire and rescue station in Bergisch-Gladbach<br \/>\nSource: City of Bergisch-Gladbach. <\/em><em>Urban planning study, Supergelb 2022 architects&#8217; office<\/em>  <\/span><span data-ccp-props=\"{}\"> <\/span><\/p>\n<h3><span data-contrast=\"auto\"><br \/>\nCourse of the study<\/span><span data-ccp-props=\"{}\"> <\/span><\/h3>\n<p><span data-contrast=\"auto\">The development of suitable drainage variants in this study was characterized by a number of special features. The location and utilization of public sewers and receiving waters, as well as protected areas, ecological factors and topographical and soil conditions on the site led to the exclusion of numerous variants. In addition, the specific requirements of a fire station placed special demands on rainwater and wastewater drainage. In the end, after intensive investigations and further expert opinions, a preferred variant was developed that included rainwater retention areas, infiltration systems and green roofs. The cost framework was calculated for this variant and a mathematical proof of flooding was provided.    <\/span><\/p>\n<p><span data-ccp-props=\"{}\">&#8212;<\/span><\/p>\n<p><span data-ccp-props=\"{}\">Find out more about our <a href=\"https:\/\/www.iwr-ing.com\/en\/services\/planning\/\">drainage planning services<\/a> <\/span><\/p>\n<p><span data-ccp-props=\"{}\"> <\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Feasibility study &#8211; site drainage for new fire station south New construction of the southern fire station In the years [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":14332,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-14335","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/14335","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/comments?post=14335"}],"version-history":[{"count":6,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/14335\/revisions"}],"predecessor-version":[{"id":14361,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/14335\/revisions\/14361"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media\/14332"}],"wp:attachment":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media?parent=14335"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/categories?post=14335"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/tags?post=14335"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}