{"id":14060,"date":"2024-08-21T12:05:44","date_gmt":"2024-08-21T10:05:44","guid":{"rendered":"https:\/\/www.iwr-ing.com\/news\/vacuum-drainage-karlshuld\/"},"modified":"2025-08-25T12:38:23","modified_gmt":"2025-08-25T10:38:23","slug":"vacuum-drainage-karlshuld","status":"publish","type":"post","link":"https:\/\/www.iwr-ing.com\/en\/news\/vacuum-drainage-karlshuld\/","title":{"rendered":"New vacuum line Karlshuld"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text uncode_shortcode_id=&#8221;749138&#8243;]<\/p>\n<h3>Laying of 315 m of new vacuum pipe in Karlshuld<\/h3>\n<p>In the municipality of Karlshuld, a major infrastructure project in the area of negative pressure drainage was recently completed. IWR GmbH planned and implemented the laying of new vacuum drainage pipes over a distance of 315 meters between vacuum station 7 and the main road. The work was carried out on behalf of the municipality of Karlshuld, while the <a href=\"https:\/\/www.seel-bau.de\/\" target=\"_blank\" rel=\"noopener\">company Seel Bau GmbH<\/a> was responsible for the execution.<\/p>\n<h6><img decoding=\"async\" class=\"alignnone wp-image-14054\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Unterdruckentwaesserung-Leitungen-Karshuld-1.jpg\" alt=\"Vacuum drainage \/ vacuum dewatering Pipes between vacuum station 7 and the main road\" width=\"420\" height=\"559\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Unterdruckentwaesserung-Leitungen-Karshuld-1.jpg 447w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Unterdruckentwaesserung-Leitungen-Karshuld-1-225x300.jpg 225w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Unterdruckentwaesserung-Leitungen-Karshuld-1-350x466.jpg 350w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Unterdruckentwaesserung-Leitungen-Karshuld-1-uai-258x343.jpg 258w\" sizes=\"(max-width: 420px) 100vw, 420px\" \/><br \/>\n<i>New vacuum line and temporary solution for the time of the shutdown in the area<br \/>\nof vacuum station 7<\/i><\/h6>\n<h3>Supply reliability guaranteed by vacuum line in four strands<\/h3>\n<p>The vacuum line was designed in four parallel lines with bypass connections to ensure a high level of supply reliability. In view of the special geographical features in Karlshuld, which make conventional drainage difficult, the municipality is completely dependent on negative pressure drainage. This system has proved particularly effective in areas with high groundwater levels, as it remains both reliable and efficient.<\/p>\n<h3>Efficient installation thanks to sawtooth profile: cost reduction and increased operational reliability<\/h3>\n<p>The sawtooth profile and the shallow laying depth of 3 meters have reduced excavation costs, making this system particularly suitable for flat regions. The parallel pipes also offer a high level of operational reliability and flexibility, while the closed system minimizes the risk of leaks and prevents the ingress of extraneous water.<\/p>\n<h6><img decoding=\"async\" class=\"alignnone wp-image-14052\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Unterdruckentwaesserung-Leitungen-Karlshuld-2.jpg\" alt=\"Laying of vacuum lines in Karlshuld\" width=\"420\" height=\"561\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Unterdruckentwaesserung-Leitungen-Karlshuld-2.jpg 439w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Unterdruckentwaesserung-Leitungen-Karlshuld-2-225x300.jpg 225w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Unterdruckentwaesserung-Leitungen-Karlshuld-2-350x467.jpg 350w\" sizes=\"(max-width: 420px) 100vw, 420px\" \/><br \/>\n<em>Vacuum line installed in trench with dewatering<br \/>\nin 4 parallel lines<\/em><\/h6>\n<p>The successful implementation of this project underlines the adaptability and advantages of the vacuum drainage method. In Karlshuld, this system ensures sustainable and future-proof wastewater disposal that meets the special geographical challenges. IWR GmbH is proud to have contributed to improving the infrastructure in Karlshuld with its expertise.<\/p>\n<p>&#8212;<\/p>\n<p>For further information on this project or our <a href=\"https:\/\/www.iwr-ing.com\/en\/services\/pneumatic-sewer-systems\/\" target=\"_blank\" rel=\"noopener\">vacuum drainage services<\/a>, please do not hesitate to contact us. Contact us to find out more about our innovative solutions for urban water management.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text uncode_shortcode_id=&#8221;749138&#8243;] Laying of 315 m of new vacuum pipe in Karlshuld In the municipality of Karlshuld, a major infrastructure [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":14055,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-14060","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/14060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/comments?post=14060"}],"version-history":[{"count":4,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/14060\/revisions"}],"predecessor-version":[{"id":15405,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/14060\/revisions\/15405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media\/14055"}],"wp:attachment":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media?parent=14060"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/categories?post=14060"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/tags?post=14060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}