{"id":13460,"date":"2024-01-15T08:00:03","date_gmt":"2024-01-15T07:00:03","guid":{"rendered":"https:\/\/www.iwr-ing.com\/news\/ladder-test-boeblingen-2023\/"},"modified":"2025-08-22T09:54:12","modified_gmt":"2025-08-22T07:54:12","slug":"ladder-test-boeblingen-2023","status":"publish","type":"post","link":"https:\/\/www.iwr-ing.com\/en\/news\/ladder-test-boeblingen-2023\/","title":{"rendered":"Ladder inspection sewer network B\u00f6blingen"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column width=&#8221;1\/1&#8243;][vc_column_text uncode_shortcode_id=&#8221;106540&#8243;]<\/p>\n<h3><strong>90 ladders and steps tested at 31 facilities<\/strong><\/h3>\n<p>In December 2023, the annual inspection of ladders and steps in the sewer network was carried out at Eigenbetrieb Stadtentw\u00e4sserung B\u00f6blingen (SEBB). 31 facilities with a total of about 90 ladders were checked for defects according to DIN EN 14396, DIN 19555 and DIN 1211. The inspected facilities in the city of <a href=\"https:\/\/www.boeblingen.de\/start.html\" target=\"_blank\" rel=\"noopener\">B\u00f6blingen<\/a> included storm water overflow and purification basins as well as storm water retention tanks. The inspection was carried out by our occupational safety specialist Anne-Marie Blumberg, supported by two employees from the <a href=\"https:\/\/www.zv-tbs.de\/\" target=\"_blank\" rel=\"noopener\">B\u00f6blingen\/Sindelfingen technical operations (ZV-TBS)<\/a>. Any defects were recorded digitally as a list, along with the respective repair measures.<\/p>\n<h3><img decoding=\"async\" class=\"alignnone wp-image-13438\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/\/Leiterpruefung-Boeblingen-2023-769x1024.png\" alt=\"IWR employee carries out ladder inspection in manhole\" width=\"420\" height=\"559\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiterpruefung-Boeblingen-2023-769x1024.png 769w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiterpruefung-Boeblingen-2023-225x300.png 225w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiterpruefung-Boeblingen-2023-768x1023.png 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiterpruefung-Boeblingen-2023-1153x1536.png 1153w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiterpruefung-Boeblingen-2023-350x466.png 350w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiterpruefung-Boeblingen-2023-uai-258x344.png 258w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiterpruefung-Boeblingen-2023-uai-720x959.png 720w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiterpruefung-Boeblingen-2023-uai-1032x1374.png 1032w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiterpruefung-Boeblingen-2023-uai-516x687.png 516w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiterpruefung-Boeblingen-2023.png 1390w\" sizes=\"(max-width: 420px) 100vw, 420px\" \/><\/h3>\n<h3><strong>Logging via the &#8220;upkeepr&#8221; app<\/strong><\/h3>\n<p>The &#8220;upkeepr&#8221; app, which was developed specifically for this type of task, was used to record the ladder inspection on site via a tablet. It was therefore possible to add inspection results, photos and comments directly after the respective inspection process, thus reducing the amount of follow-up work to a minimum.<\/p>\n<p><a href=\"https:\/\/upkeepr.de\/de\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"wp-image-13440 size-large\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/\/upkeepr-Dokumentation-mit-digitalem-Protokoll-1024x362.jpg\" alt=\"upkeepr digital order management and documentation - Digital protocol\" width=\"840\" height=\"297\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/upkeepr-Dokumentation-mit-digitalem-Protokoll-1024x362.jpg 1024w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/upkeepr-Dokumentation-mit-digitalem-Protokoll-300x106.jpg 300w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/upkeepr-Dokumentation-mit-digitalem-Protokoll-768x272.jpg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/upkeepr-Dokumentation-mit-digitalem-Protokoll-350x124.jpg 350w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/upkeepr-Dokumentation-mit-digitalem-Protokoll.jpg 1215w\" sizes=\"(max-width: 840px) 100vw, 840px\" \/><\/a><\/p>\n<h3>Safety always comes first!<\/h3>\n<p>When inspecting ladders, various safety aspects must be taken into account. For climbing heights of more than three meters, the climbing person must be protected against falling with suitable safety equipment. A tripod can be set up above the shaft for this purpose, alternatively there are cable or rail-guided ladder systems. In addition to the risk of falling, explosive atmospheres can build up in the sewer system. Gas monitors are therefore also used to ensure the safety of manholes during the ladder inspection.<\/p>\n<figure id=\"attachment_13437\" aria-describedby=\"caption-attachment-13437\" style=\"width: 420px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"wp-image-13436\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiter-in-Kanalschacht-Stadt-Boeblingen.png\" alt=\"Ladder in a manhole in the town of B\u00f6blingen\" width=\"420\" height=\"560\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiter-in-Kanalschacht-Stadt-Boeblingen.png 454w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiter-in-Kanalschacht-Stadt-Boeblingen-225x300.png 225w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Leiter-in-Kanalschacht-Stadt-Boeblingen-350x466.png 350w\" sizes=\"(max-width: 420px) 100vw, 420px\" \/><figcaption id=\"caption-attachment-13437\" class=\"wp-caption-text\">Ladder in a manhole<\/figcaption><\/figure>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;1\/1&#8243;][vc_column_text uncode_shortcode_id=&#8221;106540&#8243;] 90 ladders and steps tested at 31 facilities In December 2023, the annual inspection of ladders and [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":13450,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-13460","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/13460","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/comments?post=13460"}],"version-history":[{"count":10,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/13460\/revisions"}],"predecessor-version":[{"id":15393,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/13460\/revisions\/15393"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media\/13450"}],"wp:attachment":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media?parent=13460"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/categories?post=13460"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/tags?post=13460"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}