{"id":13428,"date":"2024-01-09T15:55:15","date_gmt":"2024-01-09T14:55:15","guid":{"rendered":"https:\/\/www.iwr-ing.com\/news\/sewer-renovation-gevelsberg\/"},"modified":"2025-09-01T13:03:27","modified_gmt":"2025-09-01T11:03:27","slug":"sewer-renovation-gevelsberg","status":"publish","type":"post","link":"https:\/\/www.iwr-ing.com\/en\/news\/sewer-renovation-gevelsberg\/","title":{"rendered":"Sewer renovated with pipe liner"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text uncode_shortcode_id=&#8221;134725&#8243;]<\/p>\n<h3>Sewer rehabilitation work completed using the pipe liner method<\/h3>\n<p>IWR is pleased to announce the successful completion of the extensive sewer rehabilitation work in Gevelsberg. In close cooperation with the town of Gevelsberg, a total of 1500 meters of main sewer were rehabilitated using pipe liner technology. In addition, around 270 meters of connecting pipe were renovated using the same process.<br \/>\nAnother focus of the renovation work was the repair of 54 manholes. Various measures were successfully realized, such as the replacement of step irons, the sealing of defects, and the mineral coating.<\/p>\n<h3>Sustainable infrastructure maintenance<\/h3>\n<p>The rehabilitation measures carried out help to maintain the infrastructure in Gevelsberg in the long term. We are pleased that we have successfully completed this project and would like to thank the <a href=\"https:\/\/www.gevelsberg.de\/\" target=\"_blank\" rel=\"noopener\">town of Gevelsberg<\/a> for the trust they have placed in us. IWR was responsible for planning and construction supervision.<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-13418\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Planausschnitt-768x1024.jpeg\" alt=\"Plan detail sewer renovation\" width=\"420\" height=\"560\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Planausschnitt-768x1024.jpeg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Planausschnitt-225x300.jpeg 225w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Planausschnitt-1152x1536.jpeg 1152w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Planausschnitt-350x467.jpeg 350w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Planausschnitt.jpeg 1536w\" sizes=\"(max-width: 420px) 100vw, 420px\" \/>   <img decoding=\"async\" class=\"alignnone wp-image-13420\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Vorbereitung-Schlauchliner-768x1024.jpg\" alt=\"Preparation for pipe liner sewer rehabilitation Gevelsberg\" width=\"420\" height=\"560\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Vorbereitung-Schlauchliner-768x1024.jpg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Vorbereitung-Schlauchliner-225x300.jpg 225w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Vorbereitung-Schlauchliner-1152x1536.jpg 1152w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Vorbereitung-Schlauchliner-350x467.jpg 350w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Vorbereitung-Schlauchliner-uai-258x344.jpg 258w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Vorbereitung-Schlauchliner-uai-720x960.jpg 720w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Vorbereitung-Schlauchliner-uai-1032x1376.jpg 1032w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Vorbereitung-Schlauchliner-uai-516x688.jpg 516w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Kanalsanierung-Gevelsberg-Vorbereitung-Schlauchliner.jpg 1536w\" sizes=\"(max-width: 420px) 100vw, 420px\" \/>   <img decoding=\"async\" class=\"alignnone wp-image-13422\" src=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg-768x1024.jpeg\" alt=\"Preparatory work for sewer rehabilitation in Gevelsberg\" width=\"420\" height=\"560\" srcset=\"https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg-768x1024.jpeg 768w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg-225x300.jpeg 225w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg-1152x1536.jpeg 1152w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg-350x467.jpeg 350w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg-uai-258x344.jpeg 258w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg-uai-1032x1376.jpeg 1032w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg-uai-1440x1920.jpeg 1440w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg-uai-720x960.jpeg 720w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg-uai-516x688.jpeg 516w, https:\/\/www.iwr-ing.com\/wp-content\/uploads\/Vorbereitungen-Schlauchlining-Kanalsanierung-Gevelsberg.jpeg 1536w\" sizes=\"(max-width: 420px) 100vw, 420px\" \/><\/p>\n<hr>\n<p>More <a href=\"https:\/\/de.wikipedia.org\/wiki\/Schlauchliner\" target=\"_blank\" rel=\"noopener\">about pipe liners<\/a><br \/>\nHere you can find our <a href=\"https:\/\/www.iwr-ing.com\/unsere-leistungen\/kanalbau-und-kanalsanierung\/\">sewer rehabilitation services<\/a>.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text uncode_shortcode_id=&#8221;134725&#8243;] Sewer rehabilitation work completed using the pipe liner method IWR is pleased to announce the successful completion of [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":13423,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-13428","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/13428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/comments?post=13428"}],"version-history":[{"count":6,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/13428\/revisions"}],"predecessor-version":[{"id":15509,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/posts\/13428\/revisions\/15509"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media\/13423"}],"wp:attachment":[{"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/media?parent=13428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/categories?post=13428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iwr-ing.com\/en\/wp-json\/wp\/v2\/tags?post=13428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}