In the course of the tender for the technical equipment of the ESI Siegen, the equipment of the wastewater treatment plants Siegen, Weidenau and Büdenholz will be renewed and smaller construction measures will be planned and stocks replenished. ESI Siegen prepared a total of six specifications and submitted them to the client for tendering.