IWR GmbH is modernising and optimising the chemical phosphorus elimination at wastewater treatment plant Goch. To this end, a chemical precipitation unit is being planned, consisting of two PE-HD storage tanks for iron(II) chloride, a dosing station with a dosing line, and a switch and control system.